The 200 PV modules are placed on an equestrian centre, with the electricity supplying the equipment at a nearby quarry. This project delivered in response to an invitation to competitive tender from a leading UK property & land agent.
A 280 metre cable run was installed via trench from the PV system to the connection point, making the best use of the electricity generated by the system.